Work Detail at Thompsonville Airport

posted in: Uncategorized | 0

We have a work detail schedueled at Thompsonville Airport for May 31st at 1:00pm.  We will be repairing runway lights along the paved runway that were damaged by the runway snow removal, and  straighting out some turf that was also damaged by snow removal. If you can, bring a shovel and rake. We will be spraying weed killer along the fence and around the runway lights. Bring a sprayer if you have one.

We will have our regular flying session after the work detail.

 

Leave a Reply

Your email address will not be published. Required fields are marked *